Home / Estimate templates / Contractor

Contractor estimate template

Write a remodel or construction estimate here and download it as a PDF, Word or Excel file. No account is needed. The sample is a kitchen. Enter your own job.

Sample data is filled in. Change it to your job.
Your business
Customer
Estimate
Parts and labor

Sales tax
Applies to

Use the rate and rule of your state. Leave the rate empty if you charge no sales tax.

Keystone Remodeling
8 Mason St, Newark, NJ 07102
NJ HIC 13VH00000000
(973) 555-0126
ESTIMATE
PREPARED FOR
Lena Moore
52 Elm Ter, Montclair, NJ 07042
Estimate no.KR-77
Estimate date11/08/2026
Valid until12/08/2026
Planned start01/11/2027
DescriptionQtyUnitUnit priceAmount
Demolition and haul-off1job$2,400.00$2,400.00
Cabinets and top, allowance1allowance$14,500.00$14,500.00
Electrical and plumbing rough-in by licensed subs1job$4,300.00$4,300.00
Install, tile, floor, paint1job$8,600.00$8,600.00
Permit1permit$650.00$650.00
Labor$15,300.00
Parts and fees$15,150.00
Subtotal$30,450.00
Estimated total$30,450.00
Deposit to start 10%$3,045.00

Scope of work: Remodel a 160 sq ft kitchen: demolition, new cabinets and quartz top, under-cabinet lights, tile backsplash, LVP floor, paint.

Not included: Appliances, moving gas or main drain lines, asbestos or mold work, repairs to hidden structural damage.

Allowances are shown per line. Changes need a signed change order before the work.

Accepted by: ______________________ Date: ____________

What you type stays in your browser. The form runs in your browser and makes the files on your device. It does not send form values to us. We count page visits and downloads with Google Analytics. If you close the page, the form data is gone. The files are PDF, Word and Excel, not an e-invoice format.

What a contractor estimate should say

A remodel estimate has to be specific enough that two contractors could price the same work. It names the scope, allowances, exclusions, schedule and payment steps.

FieldWhy it matters on a remodel
Scope by trade or roomThe customer sees what the number buys.
AllowancesSay the amount and who pays when the choice costs more.
ExclusionsList what a homeowner might assume, such as appliances or hidden damage.
ScheduleA start date and a duration.
Payment scheduleTie payments to stages. Check any deposit limit in your state.
License and insuranceThe FTC tells customers to choose licensed and insured contractors, so print the number.

Estimate, quote or bid: Say what your paper means. Write "fixed price", or say how the price can change. Ask your state board or a lawyer what binds you. See estimate vs invoice.

Filled example: 12 x 14 room addition

A different job with sample amounts. Price your own numbers.

DescriptionQtyUnitUnit priceAmount
Foundation and framing1stage$31,000.00$31,000.00
Roof tie-in, windows, siding1stage$18,500.00$18,500.00
Mechanical, electrical, plumbing subs1stage$14,200.00$14,200.00
Insulation, drywall, floor, paint1stage$12,800.00$12,800.00
Plans and permits1lot$3,100.00$3,100.00
Estimated total$79,600.00

The total sits inside the $37,549–$97,843 range from Homeyou.

Contractor projects and typical prices

Tap Add to put a line on the form. The range comes from the source in the same row. The price that the button adds is a sample inside that range, not a price recommendation.

Line itemTypical range (US)Source
Kitchen remodel$10,500–$30,000Fixr
Bathroom remodel$6,456–$24,715This Old House
Room addition$37,549–$97,843Homeyou
Demolition, whole project$6,193–$26,687Homeyou
Building permit, kitchen remodel$500–$1,500The Pricer
Building permit, bathroom remodel$200–$800The Pricer
General contractor feeYour priceNo source: use your own price
Allowance, finishesYour priceNo source: use your own price
ContingencyYour priceNo source: use your own price

Cost to Build a House puts a general contractor fee at 10–20% of the total project.

Rules to check before you send a contractor estimate

A signed estimate may become the contract

New Jersey requires a written contract for home improvement sales over $500, and all changes must also be in writing. Check whether your signed estimate meets the contract rules of your state. N.J.A.C. 13:45A-16.2

Cancel period at the home

A buyer may cancel a sale made at the home until midnight of the third business day after the sale, under the FTC rule. It has limits, so read it if you sign at the kitchen table. 16 CFR 429.1

Deposit limit in California

The down payment on a home improvement job there is capped at the lesser of $1,000 or 10 percent, except for blanket-bond licensees. The sample deposit is only an example. CSLB guide

Contractor estimate questions

What is a good contingency line?

It depends on your scope and the age of the home. Show it on its own line and say how you will use it. Bring unused amounts back to the customer.

Should I show my markup?

Choose what your contract needs. If you bill cost plus a fee, put the fee on its own line. On a fixed price, give one number per stage.

How do I handle allowances?

Enter a line with the unit set to allowance. In the terms, say that the customer pays the difference when the choice costs more, and gets a credit when it costs less.

Do I need a separate contract as well?

It depends on your state. New Jersey, for example, requires a written contract for home improvement sales over $500. This form does not add contract terms. Ask a local lawyer.

When a form is not enough

The InvoiceSnap app saves customers and past invoices. It records payments that you get outside the app. It drafts estimate lines from a job description with optional online AI, and you review each draft. The free plan has 3 invoices and 3 estimates in total, not per month. The app has 19 invoice designs. Plans and prices are in the app.

Sources and how this page was checked

Published by 731labs, the maker of InvoiceSnap. Last checked 11/09/2026. An AI tool helped draft this page. An automated check compared the legal facts and price ranges with their sources, using two AI models. No person reviewed this page. The sources are listed below. This page is general information. It is not tax or legal advice.

Total